IDENTIFIKASI DAN PENILAIAN RISIKO KECELAKAAN KERJA MENGGUNAKAN METODE JSA DAN HIRARC PADA PROYEK PEMBANGUNAN GEDUNG

  • Junita Eka Susanti Program Studi Teknik Sipil Fakultas Teknologi Infrastruktur Dan Kewilayahan Institut Teknologi Sumatera
  • Elian Zhafira Program Studi Teknik Sipil Fakultas Teknologi Infrastruktur Dan Kewilayahan Institut Teknologi Sumatera
  • Aprili Yanis Wardhani Program Studi Teknik Sipil Fakultas Teknologi Infrastruktur Dan Kewilayahan Institut Teknologi Sumatera
Keywords: HIRARC, JSA, OSH, building construction, hierarchy of controls, workplace accident risk

Abstract

Multi-storey building construction involves many activities that can lead to workplace accidents, yet Indonesian HIRARC and JSA studies generally stop at hazard lists and generic recommendations without analysing risk distribution patterns or control priorities. This study aims to identify hazards, assess risk levels and patterns, and formulate risk-control priorities for 15 work types in the construction of the International Research Center (IRC) and Water Waste Treatment Plant (WWTP) buildings at the University of Lampung. Job Safety Analysis (JSA) was used to break down work steps and identify hazards, while Hazard Identification, Risk Assessment, and Risk Control (HIRARC) was used to assess risk with the AS/NZS 4360:2004 matrix and to formulate controls based on the ISO 45001:2018 hierarchy. Data were collected through a questionnaire validated by five experts and completed by 20 respondents; the probability and severity score of each risk was set from the mean of respondent ratings. The study identified 86 potential risks, consisting of 63 medium risks (73%) and 23 low risks (27%), with no high risks. All severity scores were at levels 1–2, so the maximum risk score was 6, and 53 of the 63 medium risks were a combination of severity level 2 with probability levels 2–3. Nineteen risks with a score of 6 were set as priorities, and electrical hazards formed the hazard group with the highest mean score (5.6). Recommended controls consisted of engineering controls (48.8%), administrative controls (24.4%), PPE (24.4%), and substitution (2.3%), with no elimination option. The study concludes that project risks are low to medium as perceived by respondents under existing controls, and contributes a risk priority list and a mapping of recommended controls to the hierarchy of controls that can serve as a reference for preparing Construction Safety Plans (RKK) in similar building projects.

References

Ajslev, J. Z. N., Møller, J. L., Andersen, M. F., Pirzadeh, P., & Lingard, H. (2022). The hierarchy of controls as an approach to visualize the impact of occupational safety and health coordination. International Journal of Environmental Research and Public Health, 19(5), 2731.
AS/NZS 4360:2004. (2004). Risk management. Standards Australia & Standards New Zealand.
Briones-Bitar, J., Pacheco-Bautista, L., Morante-Carballo, F., Berrezueta, E., & Carrión-Mero, P. (2025). A systematic review of occupational health and safety to prevent fall accidents in civil works. International Journal of Safety and Security Engineering, 15(4), 819–833.
Burhanudin, B., Budiman, R., Rafiz, M., & Robandi, F. R. (2024). Risk Hazard Identification Using the HIRARC Method in the Construction of the KAI Boutique Hotel Cihampelas Building - Bandung. Journal of World Science, 3(12), 1634–1647.
Fahirah, F., & Anugrah. (2021). Risiko Keselamatan Dan Kesehatan Kerja (K3) Proyek Konstruksi Tanggul Di Kota Palu Pada Masa Pandemi Covid-19. Prosiding 5th Seminar Nasional Penelitian & Pengabdian Kepada Masyarakat 2021.
Harahap, I. M., Firdasasi, & Purwandito, M. (2022). Analisis Risiko Keselamatan Dan Kesehatan Kerja (K3) Melalui Metode HIRADC Dan Metode JSA Pada Proyek Lanjutan Pembangunan Rumah Sakit Regional Langsa. Menara: Jurnal Teknik Sipil, 17(2), 43–50.
Henri , P., & Nur Fadilah, F. (2019). Identifikasi Bahaya, Penilaian Dan Pengendalian Risiko Keselamatan Dan Kesehatan Kerja (K3) Pada Departemen Foundry PT. SICAMINDO. Jurnal Teknik Industri Heuristic
Indarta, F. A., Soetjipto, J. W., & Ratnaningsih, A. (2025). Construction safety plan for high-rise building construction projects: Evaluation and development. Jurnal Spesialis Teknik Sipil, 6(2), 78–102.
ISO. (2018). ISO 45001:2018 Occupational health and safety management systems — Requirements with guidance for use. International Organization for Standardization.
Izzah, B. Z. (2023). Analisis Risiko Keselamatan dan Kesehatan Kerja dengan Metode Hazard Identification, Risk Assessment, and Risk Control (HIRARC) pada Proyek Graha 2 RSI.
Jeelani, I., Albert, A., & Gambatese, J. A. (2017). Why do construction hazards remain unrecognized at the work interface? Journal of Construction Engineering and Management, 143(5), 04016128.
Johari, G. J., & Aprilia, R. (2026). Evaluasi K3 pada proyek Gedung BNN Bandung dengan metode HIRARC. Jurnal Konstruksi, 24(1), 892–900.
Kabul, E. R., & Yafi, F. (2022). HIRARC method approach as analysis tools in forming occupational safety health management and culture. Sosiohumaniora, 24(2), 218–226.
Kementerian PUPR. (2021). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 10 Tahun 2021 tentang Pedoman Sistem Manajemen Keselamatan Konstruksi. Kementerian Pekerjaan Umum dan Perumahan Rakyat.
Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607–610.
Kurnianingtias, M. (2022). Analisis Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) dengan Metode Hazard Identification Risk Assessment and Risk Control (HIRARC) di Workshop Garmen Kampus Tekstil. Jurnal Tekstil: Jurnal Keilmuan Dan Aplikasi Bidang Tekstil Dan Manajemen Industri, 5(2), 77–87.
Pramesthi, S. A., Anwar, R., & Susanti, L. (2025). Risk analysis of occupational safety and health analysis using the HIRARC method at building construction. ASTONJADRO, 14(2), 484–497.
Ramadhan, M. R., & Dhartikasari, E. (2025). Analisis K3 pada aktivitas pemasangan scaffolding dengan menggunakan metode JSA dan HIRARC di PT Bramindra Indotama tahun 2025. INTECOMS: Journal of Information Technology and Computer Science, 8(6), 2000–2007. https://doi.org/10.31539/6myq6p33
Supriyadi, & Ramdan, F. (2017). Identifikasi bahaya dan penilaian risiko pada divisi boiler menggunakan metode Hazard Identification Risk Assessment and Risk Control (HIRARC). Journal of Industrial Hygiene and Occupational Health.
Unetbu, L. M., Leuhery, L., & Apalem, D. R. (2025). Analisis risiko pada proyek konstruksi pembangunan Gedung Kantor Bahasa Provinsi Maluku. Jurnal Penelitian Multidisiplin Bangsa, 1(10), 1959–1969.
Winge, S., Albrechtsen, E., & Mostue, B. A. (2019). Causal factors and connections in construction accidents. Safety Science, 112, 130–141.
Published
2026-10-31
Abstract viewed = 20 times
PDF (Bahasa Indonesia) downloaded = 2 times