KAJIAN PENERAPAN ASPEK KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK JALAN TOL XYZ

  • Hamonangan Girsang Program Studi Profesi Insinyur Fakultas Teknik Universitas Mercu Buana
  • Hani Amalia Program Studi Teknik Sipil Fakultas Teknik Universitas Mercu Buana
Keywords: Safety, Health, Work, Implementation, Toll Roads

Abstract

The simultaneous implementation of occupational safety and health (OSH) has a positive and significant impact on accident rates. The higher the level of safety and OSH in the workplace, the lower the rate of workplace accidents. This study is related to the XYZ (Elevated) Toll Road Project, a toll road construction project that connects the Inner City Toll Road. During the execution of this project, an incident occurred in which an excavator operator made an error while operating heavy equipment and touched the MCB in the work area. This incident resulted in material damage and the potential for minor injuries to workers. To identify the key factors influencing OSH implementation in the XYZ (Elevated) Toll Road Project, a survey was conducted using questionnaires provided to staff and workers on the project. The collected data were then analyzed using SPSS software. The results of the research showed that OSH planning factors have a dominant influence on OSH implementation in the XYZ (Elevated) Toll Road Project, with a percentage of 41%.

References

Amalia, K. R., Situmeang, S. Y., Syapawi, A., Dzaky, A., Zhafirah, N. I., & Agustian, R. (2025). Identifikasi Risiko Kecelakaan dan Keselamatan Kerja (K3) pada Pelaksanaan Proyek Konstruksi di Sumatera Selatan. Jurnal Talenta Sipil, 8(2), 831-836.
Amu, T. E. J., Tjakra, J., & Prastasis, P. A. K. (2023). Penerapan Metode PERT Dan CPM Dalam Pembangunan Christian Center (Vol. 21, Issue 83).
Arafat, Y., Retna, D., & Kartadipura, H. (2018). Analisis faktor implementasi manajemen k3 terhadap kinerja biaya pelaksanaan proyek konstruksi. Jurnal Teknologi Berkelanjutan (Sustainable Technology Journal, 7(1), 16–25. http://jtb.ulm.ac.id/index.php/JTB
Faridah, Y. H., & Girsang, H. (2024). Assessment of Energy Efficiency and Conservation Aspects Based on Building Information Modeling at Park Residence Building. Rekayasa Sipil, 18(3), 289-297.
Gobel, R., Tuloli, M. Y., & Sumaga, A. U. (2025). Analisis Manajemen Risiko Keselamatan dan Kesehatan Kerja dengan Metode Hazard Analysis (Studi Kasus pada Proyek Pembangunan Rumah Susun BPK RI). Research Review: Jurnal Ilmiah Multidisiplin, 4(1), 209-227.
Hudoyo, C. P., Rachmanudin, M. E., & Widayanti, D. A. (2025). Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) dalam Proyek Konstruksi Infrastruktur Jalan: Evaluasi dan Mitigasi. JRST (Jurnal Riset Sains dan Teknologi), 51-62.
Kholida, L. (2021). Strategi Perencanaan dan Pelaksanaan dalam Pengadaan Subkontraktor untuk Meningkatkan Kinerja K3 pada Proyek Konstruksi Gedung. Rekayasa Sipil, 10(1), 1-7.
Magfirona, A., Romdhoni, A. F., Sunarjono, ., & Priyanto, B. (2022). Analisa variabel penerapan sistem manajemen keselamatan dan kesehatan kerja (smk3) proyek jalan tol Solo-Jogja. Simposium Nasional RAPI XXI-2022 FT UMS, 95–99.
Praditya, A. R. A., Wibowo, K., & Sulistyo, J. A. (2025). Manajemen Risiko Keselamatan Konstruksi Pekerjaan di Atas Jalan Tol. Innovative: Journal Of Social Science Research, 5(3), 1904-1922.
Sampurna, R. M., & Girsang, H. (2025). Analisis implementasi keselamatan dan kesehatan kerja pada proyek konstruksi berbasis hiradc. axial: jurnal rekayasa dan manajemen konstruksi, 13(2), 102-110.
Surbakti, S., & Naibaho, P. R. T. (2025). Pemodelan Manajemen Keselamatan dan Kesehatan Kerja (K3) Terhadap Kinerja Waktu Proyek Konstruksi Jalan. Jurnal Ilmiah Desain & Konstruksi, 24(1), 66-75.
Srisantyorini, T., & Safitriana, R. (2020). Penerapan Sistem Manajemen Keselamatan dan Kesehatan KerjapadaPembangunan Jalan Tol Jakarta-Cikampek2 Elevated. Jurnal Kedokteran Dan Kesehatan, 16(2), 151–163.
Steven, & Waty, M. (2020). Analisis_penerapan_sistem_manajemen_keselamatan_da. JMTS: Jurnal Mitra Teknik Sipil, 3(3), 547–554.
Published
2025-10-31
Abstract viewed = 0 times
PDF (Bahasa Indonesia) downloaded = 0 times