PENGARUH KUALITAS SUMBER DAYA MANUSIA TERHADAP RISIKO KEGAGALAN PENCAPAIAN KINERJA MENGGUNAKAN METODE FAULT TREE ANALYSIS (Studi Kasus : Proyek Pembangunan RSPTN Universitas Jember)
Abstract
The State University Hospital Construction Project (RSPTN) at the University of Jember exhibits high complexity in its implementation, involving various factors that have the potential to impact the quality of Human Resources (HR) and the risk of performance failure. This study aims to identify failure risks, evaluate dominant factors affecting Human Resource (HR) quality, and formulate risk mitigation strategies. The Fault Tree Analysis (FTA) method is used to systematically analyze the root causes of the problems. The results of the study indicate that the dominant factors contributing to failure are a lack of awareness regarding job responsibilities, poor coordination, and limited worker experience, with the highest Severity Index (SI) value recorded at 99,67%. Recommended mitigation measures include technical training, certification, strict supervision, and the implementation of a reward and punishment system. With appropriate mitigation strategies, failure risks can be reduced, and project performance can be improved.
References
Anis Suryaningrum, H. R. (2024). Analisis faktor penyebab keterlambatan menggunakan metode Fault Tree Analysis (Studi kasus pembangunan Office Headquarter Surabaya). Jurnal Ilmiah, 2(1), 18–29.
Anugrah, N. R., Fitria, L., & Desrianty, A. (2015). Usulan perbaikan kualitas produk menggunakan metode Fault Tree Analysis (FTA) dan Failure Mode and Effect Analysis (FMEA) di Pabrik Roti Bariton 1. Reka Integra, 3(4), 147–148.
Anggraini, I. (2021). Pengaruh kualitas sumber daya manusia terhadap kegagalan pelaksanaan pembangunan menggunakan metode Fault Tree Analysis.
Anthony, M. (2021). Analisis risiko keselamatan dan kesehatan kerja (K3) pada pengoperasian reciprocating compressor menggunakan metode SWIFT (Structured What If Technique) di PT. ABC.
Daniel, M., Rosyid, P., Hd, A., & Wisudawan, S. T. (2018). The study of jacket structure construction project delays using checklist analysis and event tree analysis.
Dewi Arman, U., Melasari, J., Saputri, S. E., & Sipil, J. (2021). Identifikasi faktor penyebab berkontribusi terjadinya kegagalan konstruksi jalan dengan metode Fault Tree Analysis (FTA). Jurnal Teknik Sipil, 6(2).
Faiz, S., & Yuamita, F. (2023). Identifikasi potensi bahaya pada area peleburan logam menggunakan metode Hazard Identification Risk Assessment and Risk Control (HIRARC) dan Fault Tree Analysis (FTA) di CV. Barokah Logam Sejahtera. Jurnal Ilmiah Multidisiplin, 2(8).
Gusthia, I. (2022). Perbedaan Event Tree Analysis dan Fault Tree Analysis.
I Nyoman Yudha Astana, G. A. P. C. D., & Ni Ketut Sumarni. (2020). Strategi peningkatan kinerja pengelolaan proyek konstruksi. Jurnal Spektran, 8(2).
Ihsan, A. (2022). Analisis risiko kecelakaan kerja menggunakan metode FMEA pada proyek pembangunan jalan tol ruas Sigli – Banda Aceh struktur elevated.
Ilham Gesang Santoso, T. (2020). Analisa penyebab keterlambatan proyek bangunan gedung perkantoran 53 lantai menggunakan metode Fault Tree Analysis (FTA).
Irawan, S., & Suroso, A. (2023). Analisis pengaruh kinerja mutu terhadap pengambilan keputusan take over pada proyek konstruksi gedung tinggi. Jurnal Aplikasi Teknik Sipil, 21(1).
Nurjaman, R. A., Mulyawati, F., & Syafier, S. (2023). Identifikasi keterlambatan proyek dengan metode Failure Mode and Effect Analysis (FMEA) dan Fault Tree Analysis (FTA) SNI 31010 Tahun 2016. Jurnal Ilmiah Indonesia, 3(12), 1162–1171.
Saputri, A. (2019). Identifikasi dan analisa risiko kontruksi pada proyek pembangunan gedung Fakultas Kedokteran Universitas Muhammadiyah Prof. Dr. Hamka.
Sudrajat, A., Setiawan, A., & Novitrie, N. A. (2018). Analisis potensi bahaya dengan metode Checklist dan What-If Analysis pada saat commissioning Plant N83 di PT. Gas Industri.
Supriyadi, I., Khamdari, E., & Susilowati, F. (2020). Peran manajemen sumber daya manusia dalam peningkatan kinerja perusahaan konstruksi.
Suryadi, D., Sulistio, H., & Megawati, L. A. (2021). Analisis risiko kegagalan konstruksi infrastruktur permukiman. Jurnal Terapan Bidang Rekayasa Sipil, 9(2), 129–138.
Shofa, M. J., Listiyana, L., & Cahyadi, D. (2018). Usulan perbaikan proses cross drainage untuk mempercepat waktu proyek pembangunan jalan raya. Jurnal INTECH Teknik Industri Universitas Serang Raya, 4(2), 71.
Wiyana, Y. E. (2019). Analisis kegagalan konstruksi dan bangunan dari perspektif faktor teknis.

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.










2.png)
.png)





.png)