PERENCANAAN PELAKSANAAN PROYEK KONSTRUKSI KANTOR KPU KABUPATEN BADUNG
Abstract
Construction project implementation planning is an important stage that aims to optimize time, cost, and quality of work. In the construction project of the Badung Regency KPU Office Building, implementation planning is very crucial considering the location of the project which is in a densely populated area, so that an appropriate and efficient implementation method is needed. The problems faced are how to prepare an implementation schedule, calculate resource requirements, and plan costs systematically so that the project can run according to plan. This study uses the Precedence Diagram Method (PDM) to prepare the project schedule and Microsoft Project as a visualization tool. In addition, an analysis of human resource needs, materials, and tools was carried out as well as the preparation of the Implementation Cost Plan (RBP) and Budget Plan (RAB). The results of the study show that implementation planning using the PDM method produces a structured and efficient project schedule. The total cost obtained from the RBP analysis results is IDR 4,159,270,327.34, while the RAB reaches IDR 4,623,397,141.26, with a cost difference of IDR 464,126,813.93. This research is expected to be a reference for planning the implementation of similar building construction projects, especially in the context of using the PDM method.
References
April. (2017). Kurva S. Institut Teknologi Budi utomo.
Arianie, G. P. (2017). Perencanaan Manajemen Proyek Dalam Meningkatkan Efisiensi Dan Efektifitas Sumber Daya Perusahaan. Jurnal Teknik Industri.
Asiyanto. (2003). Construction Project Cost Management.
Asiyanto. (2010). Mannajemen Konstruksi untuk Jasa Konstruksi. Jakarta: PT. Pradnya Paramita.
Azmi. (2013). Menggunakan Microsoft Project Untuk Keberhasilan Proyek. Medan: STIMIK Triguna Dharma.
Bernadetha Aurelia Oktavira, S. H. (2023, July 25). Tahapan Pelaksanaan Tender Pemerintah Indonesia. HukumOnline.Com.
Dimyati dan Nurjaman,. (2014). Pengertian Proyek. Universitas Muhammad Diah Malang, 6.
Ervianto. (2005). Proyek Konstruksi. Yogyakarta: CV. ANDI OFFSET.
Freddy Rangkuti. (2006). Analisis SWOT : Teknik Membedah Kasus Bisnis. Universitas Sebelas Maret, 18-19.
Husen. (2011). Manajemen Proyek. Yogyakarta: CV. ANDI OFFSET.
Ibrahim. (2001). Rencana dan Estimate Real of Cost. Jakarta: Bumi Aksara.
Ibrahim, H. (2013). Strategi Penerapan SMK3 berdasarkan OHSAS 18001 : 2007 dan Permenaker No. 50/MEN/2012.
Jawat, I. W. (2004). Penerapan Metode Konstruksi Dalam Mewujudkan Green Construction ( Studi Kasus: Pekerjaan Tanah Pada Proyek Jalan ).
Jawat, I. W. (2017). Metode Pelaksanaan Konstruksi Revetment. Paduraksa, 363.
Kholil. (2012). Alat Berat. Bandung: PT. Remaja Rosdakarya.
Salim. (2017). Analisa SWOT Pembangunan Gedung Kantor SNVT PJSA BBWS Pemali Juana. 30.
Setiawati. (2015). Penyusunan Standard Operating Procedures (SOP) pada PT. Cipta Graha di Surabaya. AGORA.
Soeharto, I. I. (1999). Manajemen proyek dari konseptual sampai operasional. erlangga.
Suprapto. (2008). Bahasa Pemrograman.
Suteja, I. W. (2011). Dokumen Pengadaan/ Pelelangan Pada Industri Konstruksi. Singhadwala, 47-52.
Syah. (2004). Manajemen Proyek Kiat Sukses Mengelola Proyek. PT. GramediaPusta, Cetakan Pertama.
Widiasanti dan Lenggogeni. (2013). Manajemen Konstruksi. Bandung: Pt. Remaja Rosdakarya.

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.










2.png)
.png)





.png)