Optimalisasi Biaya Pelaksanaan Proyek Sumitra Hotel dan Resort Melalui Value Engineering
Abstract
One of the most important elements influencing a building project's success is its implementation cost. Issues including ineffective material utilization, inept resources, and improper work method selection frequently arise during project execution. These problems may cause projects to be executed with significant time and expense overruns. Project cost control can be used to lessen these issues. Value engineering analysis is the research methodology employed. Value engineering is used to maximize project budgets by locating and removing wasteful spending. Optimizing building projects in terms of time, money, technology, and creativity is the goal of this study. Price surveys serve as the major means of gathering data for the descriptive quantitative research design. Project managers and material suppliers are among the respondents. The Unit Price Analysis (AHSP) and the Budget Plan (RAB) are two examples of secondary data that were employed. The best alternative design and the least expensive alternative design are the two categories into which alternative designs are divided based on the analysis results. The cheapest option's cost optimization is 9.95%, or Rp1,336,499,405, of the initial design cost, whereas the best option's is 9.14%, or Rp1,222,120,406..
References
Dinariana, D., Nurjaman, H.N. and ... (2021). Value Engineering Of Architectural Work In Navalunit Building Planning, In West Papua. Journal of Architecture and …, 6(9), pp. 37–49. Available at: https://www.academia.edu/download/69367599/E06093749.pdf
Diputera, I.G.A. et al. (2018). Penerapan Value Engineering (Ve) Pada Proyek Pembangunan Taman Sari Apartement. Jurnal Spektran, 6(2), pp. 210–216. Available at: https://ojs.unud.ac.id/index.php/jsn/article/view/42315.
Effendy, A. et al. (2022). Pelatihan Penyusunan Rencana Anggaran Biaya (RAB) untuk Pekerjaan Konstruksi Sederhana. Jurnal Abdimas UNAYA, 3(2), pp. 1–6. Available at: www.jurnal.abulyatama.ac.id/abdimas.
Harahap, M.A.K. dkk.. (2023). Rencana Anggaran Biaya (RAB) Rekonstruksi Jalan Lumban Pande -Tanjungan Kecamatan Palipi (DID). Jurnal Santeksipil, 4(1), pp. 11–21. https://doi.org/10.36985/jsl.v4i1.881
Hasan Busri, M. (2014) ‘Analisis Alternatif Desain Bangunan Jembatan Dengan Value Engineering’, Juli, 7(1), pp. 31–38
Januar, F.T. (2011) ‘Analisis Faktor-faktor penyebab Rework pada Pekerjaan Konstruksi.
Karim, D., Nasution, A. and Ashad, H. (2023) ‘Rekayasa Nilai Pada Bangunan Auditorium Gedung Penunjang Akademik Politeknik Ilmu Pelayaran ( PIP ) Salodong Makassar’, Innovative: Journal of Social Science Research, 3(3), pp. 6422–6430. Available at: https://j-innovative.org/index.php/Innovative/article/view/2862.
Kartohardjono, A. (2017) ‘ANALISIS VALUE ENGINEERING PADA PROYEK PEMBANGUNAN APARTEMENT DI CIKARANG oleh’, pp. 41–58
Khaerul Bahri and Retno Indryani (2018). Penerapan VE pada proyek Transmart Carrefour Padang. 7(1), pp. 3–7. http://dx.doi.org/10.12962/j23373539.v7i1.28799 .
Nandito, A., Huda, M. and Siswoyo (2020). Penerapan Value Engineering Pada Proyek Pembangunan Puskesmas Rego Manggarai Barat NTT. Jurnal Rekayasa dan Manajemen Konstruksi, 8(3), pp. 171–186 .
Nurjanah. (2021). Analisis Kepuasan Konsumen dalam Meningkatkan Pelayanan Pada Usaha Laundry Bunda Nurjanah. Jurnal Mahasiswa, 1, pp. 117–128.
Prasetiyo, H., Poernomo, Y.C.S. dan Candra, A.I. (2020). Studi Perencanaan Perkerasan Lentur Dan Rencana Anggaran Biaya (Pada Proyek Ruas Jalan Karangtalun – Kalidawir Kabupaten Tulungagung). Jurnal Manajemen Teknologi & Teknik Sipil, 3(2), p. 347. https://doi.org/10.30737/jurmateks.v3i2.1187.
Pratiwi, nuning. (2017). Penggunaan Media Video Call dalam Teknologi Komunikasi. Jurnal Ilmiah DInamika Sosial, 1, pp. 213–214.
Pratiwi, N.A. (2014). Analisa Value Engineering Pada Proyek Gedung Riset dan Museum Energi dan Mineral. Institut Teknologi Bandung, 2(1), pp. 166–170.
Santoso, V.Y. (2020). Penerapan Value Engineering pada Struktur Bangunan Gedung (Studi Kasus : Proyek Gedung Kantor Dinas Pemadam Kebakaran Kota Surakarta. e-Jurnal MATRIKS TEKNIK SIPIL, pp. 236–245.
Saori, S. dkk. (2021). Analisis Pengendalian Mutu pada Industri Lilin (Studi Kasus pada PD Ikram Nusa Persada Kota Sukabumi). Jurnal Inovasi Penelitian. Vol. 1(No. 10), pp. 2133–2138.
Sulistyawati, W., Wahyudi and Trinuryono, S. (2022). Analisis (Deskriptif Kuantitatif) Motivasi Belajar Siswa Dengan Model Blended Learning Di Masa Pandemi Covid19. Kadikma, 13, No. 1, pp. 68–73 .
Usboko, G.P., Seran, G. and Pattiraja, A.H. (2024) ‘Penerapan Value Engineering Pada Elemen Bangunan Gedung ( Tangga ) Balai Latihan Kerja UPTP Kupang’, 4, pp. 9628–9647.
Yusuf, M., Parwati, C.. and Nasution, A.. (2021) ‘Analisis Rekayasa Nilai Lampu Hias dalam Usaha Pengembangan Produk’, Jurnal Ilmiah Teknik Industri dan Informasi , 9(2), pp. 159–166

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.










2.png)
.png)





.png)